Cloud & infrastructure
Place each workload in the right place, with an explicit level of control.
Public, private or qualified cloud, or in-house infrastructure: IKNSA builds a trajectory grounded in criticality, control, operations and exit capability.
- Decision
- Architecture
- Delivery
- Operations
The decision point
A credible cloud trajectory starts with workload placement, not with a provider.
Each application receives a target proportionate to its impact, its dependencies, its performance needs and its legal requirements. The common foundations — network, identity, keys, policies, observability and costs — are addressed before accounts and environments multiply.
Working scope
The dimensions examined together.
The framing avoids treating separately subjects that condition one another. The final scope remains adapted to the organisation and its priorities.
- Workload classification and dependencies
- Landing zones, network and connectivity
- Identities, keys and administration
- Security, logging and continuity
- FinOps, capacity and service commitments
- Sovereignty, contracts and reversibility
A usable result
A platform governed before it is consumed.
The target distinguishes common decisions from application exceptions. It gives the teams deployment paths, automatic controls, cost indicators and a testable exit strategy.
- 01Placement matrix and target architecture
- 02Landing-zone foundation and consumption rules
- 03Migration waves with risks and prerequisites
- 04Operating model, FinOps and reversibility
Method
An engagement that stays readable from scope to decision.
Qualify
Connect the need to the processes, the users, the dependencies and the success criteria.
Design
Arbitrate the architecture, the responsibilities, the risks and the trajectory before committing to delivery.
Implement
Deliver in controlled stages with acceptance criteria, evidence and regular visibility.
Hand over
Document operations, decisions and reversibility to avoid any implicit dependency.
Point of vigilance
What the engagement must make explicit.
A migration must not be declared complete when the machines have changed hosting. Identities, monitoring, backup, support, costs, responsibilities and the exit scenario are part of the expected result.
The first conversation verifies the context, the level of urgency, the stakeholders and the output genuinely expected.
Frame this engagement See Build & operate Start with a guided assessmentFirst conversation
Let’s discuss the next point of control for your information system.
A project to frame, operations to take over, compliance to demonstrate? Describe the context. You will get a first considered reading — not a generic brochure.